Library work continues

0

Jack Whitford, left, of Englewood, and Gary Vondenhuevel, of Sidney, place bricks, Friday, Jan. 13, around a new elevator door which will be one of the entrances to a new elevator at the Amos Memorial Public Library. The new elevator is part of the library’s expansion and remodeling. The library will start moving things into the new addition Feb. 13. After the older building is cleared remodeling on it will begin. The remodeling will include enclosed study areas on the top floor.

Jack Whitford, left, of Englewood, and Gary Vondenhuevel, of Sidney, place bricks, Friday, Jan. 13, around a new elevator door which will be one of the entrances to a new elevator at the Amos Memorial Public Library. The new elevator is part of the library’s expansion and remodeling. The library will start moving things into the new addition Feb. 13. After the older building is cleared remodeling on it will begin. The remodeling will include enclosed study areas on the top floor.
http://aimmedianetwork.com/wp-content/uploads/sites/47/2017/01/web1_SDN011417Library.jpgJack Whitford, left, of Englewood, and Gary Vondenhuevel, of Sidney, place bricks, Friday, Jan. 13, around a new elevator door which will be one of the entrances to a new elevator at the Amos Memorial Public Library. The new elevator is part of the library’s expansion and remodeling. The library will start moving things into the new addition Feb. 13. After the older building is cleared remodeling on it will begin. The remodeling will include enclosed study areas on the top floor. Luke Gronneberg | Sidney Daily News

No posts to display